architecture

a design development architect

Tehcnical Drawings
Tehcnical Drawings

The project focused mainly on the connection details of the bridge.

Tehcnical Drawings
Tehcnical Drawings

The project focused mainly on the connection details of the bridge.

Other related links!

Portal Bridge - 2013

The brief required a design for bridge spanning 10m.

This was part of my Technical work at the University of Westminster whilst undertaking my undergraduate studies under the supervision of Pete Silver and William Mclean.


 

  • LinkedIn - Black Circle
  • Pinterest - Black Circle
  • Instagram - Black Circle
  • Facebook - Black Circle